The technique known as gap analysis is widely used in the TOGAF Architecture Development Method (ADM) to validate an
architecture that is being developed. The basic premise is to highlight a shortfall between the Baseline Architecture
and the Target Architecture; that is, items that have been deliberately omitted, accidentally left out, or not yet
defined.
Introduction
A key step in validating an architecture is to consider what may have been forgotten. The architecture must support all
of the essential information processing needs of the organization. The most critical source of gaps that should be
considered is stakeholder concerns that have not been addressed in prior architectural work.
Potential sources of gaps include:
-
Business domain gaps:
-
People gaps (e.g., cross-training requirements)
-
Process gaps (e.g., process inefficiencies)
-
Tools gaps (e.g., duplicate or missing tool functionality)
-
Information gaps
-
Measurement gaps
-
Financial gaps
-
Facilities gaps (buildings, office space, etc.)
-
Data domain gaps:
-
Data not of sufficient currency
-
Data not located where it is needed
-
Not the data that is needed
-
Data not available when needed
-
Data not created
-
Data not consumed
-
Data relationship gaps
-
Applications impacted, eliminated, or created
-
Technologies impacted, eliminated, or created
Suggested Steps
The suggested steps are as follows:
-
Draw up a matrix with all the Architecture Building Blocks (ABBs) of the Baseline Architecture on the vertical
axis, and all the ABBs of the Target Architecture on the horizontal axis.
-
Add to the Baseline Architecture axis a final row labeled "New", and to the Target Architecture axis a final column
labeled "Eliminated".
-
Where an ABB is available in both the Baseline and Target Architectures, record this with "Included" at the
intersecting cell.
-
Where an ABB from the Baseline Architecture is missing in the Target Architecture, each must be reviewed. If it was
correctly eliminated, mark it as such in the appropriate "Eliminated" cell. If it was not, an accidental omission
in the Target Architecture has been uncovered that must be addressed by reinstating the ABB in the next iteration
of the architecture design - mark it as such in the appropriate "Eliminated" cell.
-
Where an ABB from the Target Architecture cannot be found in the Baseline Architecture, mark it at the intersection
with the "New" row as a gap that needs to filled, either by developing or procuring the building block.
When the exercise is complete, anything under "Eliminated" or "New" is a gap, which should either be explained as
correctly eliminated, or marked as to be addressed by reinstating or developing/procuring the function.
Example
Gap Analysis Example shows an example analysis for
ABBs that are services from the Network Services category of the Technical Reference Model (TRM), and shows a number of
services from the Baseline Architecture missing from the Target Architecture.
Figure: Gap Analysis Example
|